Book Online

Check-In Date Duration
 

Front Gate Repair Works Underway

Our front entry & exit gates located on Mulyan Place will be undergoing substantial repair works beginning on the 18th of September, 2023.

The works are expected to be complete by the 11th of October, with all going to plan and weather permitting.

For those who will be booking a stay with us during the September – October period, please rest assured that there will be no disruptions to our guests.

However do keep in mind that during this period, there will be no access to and from the front entrance & exit gates at all times. All incoming and outgoing traffic must use the back gate of the resort, which is located on Heeb Street. Any guest arrivals will need to enter the resort from this gate. The Heeb Street gate will be left open during staffed hours, so please feel free to enter through Heeb Street, turn left, and drive straight through to our reception, which is located opposite to our pool area.  If the gate is closed at the time of arrival, guests will need to call reception to be let into the resort on (07) 5597 0650.

Please feel free to reach out to us if you need help or directions to our back gate on Heeb Street.

We thank you for your understanding while we improve the resort for all of our future guests.